Renovation of the right wing wall of the energy dissipater of Topolnitsa Dam

Scope of construction works: Restoring of completeness of concrete elements in the construction of the HPP drainage Formworks Reinforcement works Concrete works Installation of blocks with polymer structure Drilling and injection works Hydro installation of right wing wall and wall of HPP drainage Employer: NEK EAD
Read More

Correction of river bed

Sorry, this entry is only available in Български.Обхват на извършените дейности: изкопни работи насипни работи кофражни работи армировъчни работи бетонови работи отводнителни канавки дренаж Период на сключване на договора: юли 2008 г. Статус: Завършен
Read More

Repair works of low pressure pipeline in the section from valve blade 1 (situated next to the reservoir of Kamenitsa HPP) to valve blade 2 (situated next to lower water chamber of Kamenitsa HPP)

Scope of works: Dismantling of existing pipeline Installation of new fiber glass pipes Fortification and backfilling of pipeline Cleaning the construction waste from the route Employer: Bulgarian Joint-Stock Company Granitoid AD
Read More