Cleaning Zlatna Panega River in the corrected section 550 m from Lukovit Dam

Scope of works:

  • Excavating and removing the material deposited in the corrected areas using mechanization in difficult conditions
  • Loading and transportation up to 5 km

Employer: VEC Engineering AD

Leave a Reply