Renovation of the right wing wall of the energy dissipater of Topolnitsa Dam

Scope of construction works:

  • Restoring of completeness of concrete elements in the construction of the HPP drainage
  • Formworks
  • Reinforcement works
  • Concrete works
  • Installation of blocks with polymer structure
  • Drilling and injection works
  • Hydro installation of right wing wall and wall of HPP drainage

Employer: NEK EAD

Leave a Reply